RENCANA ANGGARAN BIAYA (RAB)
|
|||||
PEMBANGUNAN
MASJID ‘ AL QADAR’
|
|||||
GRIYA
PAYA ROBA INDAH BINJAI
|
|||||
NO
|
NAMA
KEGIATAN
|
SATUAN
|
VOLUME
|
HARGA
SATUAN
|
JUMLAH
(RP)
|
1
|
Batu Mangga
|
m3
|
50
|
400,000
|
20.000.000
|
2
|
Pasir
|
m3
|
1000
|
100,000
|
100.000.000
|
3
|
Abu bata
|
m3
|
400
|
90,000
|
36.000.000
|
4
|
Batu kris
|
m3
|
400
|
75,000
|
30.000.000
|
5
|
Bata merah
|
buah
|
20000
|
350
|
7.000.000
|
6
|
Kayu
|
buah
|
250
|
35.000
|
8.750.000
|
7
|
Semen
|
zak
|
20000
|
49,000
|
980.000.000
|
8
|
Besi 0 16 mm
|
batang
|
1500
|
151,500
|
227.250.000
|
9
|
Besi 0 14 mm
|
batang
|
3000
|
99,700
|
229.100.000
|
10
|
Besi 0 8 mm
|
batang
|
3400
|
43,700
|
148.580.000
|
11
|
Krikil/ Batu
pecah
|
M3
|
200
|
150,000
|
30.000.000
|
12
|
Papan
|
lembar
|
200
|
45000
|
9.000.000
|
13
|
Bambu
|
batang
|
1550
|
12,000
|
18.600.000
|
14
|
Kayu kusen
|
unit
|
12
|
7.000,000
|
84.000.000
|
15
|
Paku
|
kg
|
1000
|
8,000
|
9.000.000
|
16
|
Pipa paralon 6 inci pvc
|
buah
|
60
|
90,000
|
5.400.000
|
17
|
Daun jendela/pintu
|
buah
|
28
|
1.500,000
|
42.000.000
|
18
|
Kaca
|
meter
|
80
|
65,000
|
5.200.000
|
19
|
Jalosi
|
buah
|
155
|
95,000
|
14.725.000
|
20
|
Keramik/granit
|
meter
|
500
|
120,000
|
60.000.000
|
21
|
Triplek 12 ml
|
buah
|
50
|
250,000
|
12.500.000
|
22
|
Kunci, engsel dan grendel
|
-
|
-
|
5.000.000
|
|
23
|
Pompa air, pipa, kran & Kloset
|
-
|
-
|
5.000.000
|
|
24
|
Cat, plitur, plamir
|
-
|
-
|
30.000.000
|
|
25
|
Plafon/eternit
|
-
|
-
|
30.000.000
|
|
26
|
Instalasi listrik
|
-
|
-
|
20.000.000
|
|
27
|
Tenaga kerja
|
-
|
-
|
280.000.000
|
|
28
|
Lain-lain
|
-
|
-
|
100.000.000
|
|
JUMLAH
TOTAL
|
2.458.105.000
|
||||
Terbilang : (Dua miliar empat ratus
lima puluh delapan juta seratus lima
ribu rupiah)
|
|||||
Sabtu, 14 Februari 2015
Rencana Rehabilitasi Masjid Al-Qadar
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar
Silahkan Berkomentar